Exterior
$23,000.00
Vinyl Siding
$
Remove current vinyl siding, replace Tyvek house wrap and insulation as needed. Basic carpentry to be included.
Decking
$
Repair decking as needed, remove lattice, handrails, deck boards and power wash entire structure.
Roof Repairs
$
Replace garage roof and 6 squares on main house.
Mechanicals
$20,650.00
Furnace
$
Service with possible partial rebuild.
Plumbing
$
Supply lines all replaced with Pex water lines, drain lines replaced as needed. New supply lines, toilets, manifolds, shutoff valves for each unit.
Electrical
$
Install hard wired smoke alarms, replace all outlets, switches and GFCI outlets, partial re-wire in ADU.
Interior
$57,950.00
Cleanout
$
Cleanout all 5 units, including appliances.
Appliance Package
$
Stove and refrigerator package for all units.
Bathroom
$
Tub, tub surround, vanity.
Flooring
$
LVP flooring throughout kitchen, living room and bathroom. Carpet in bedrooms.
Paint
$
Two paint colors throughout units.
Kitchen
$
Cabinetry, countertops, sink, faucet.
Exterior Doors
$
Replace exterior doors and frames.
Dumpsters
$
30 Yard Dumpsters for debris removal.
Drywall
$
Drywall replacement throughout Unit 2, partial in Units 1, 3 & 5.
Carpentry
$
Replace subfloor as needed, level and repair.
Contingency
—
Contingency
$
Budget reserve for unexpected costs or scope changes during renovation.